DSC IQ Pro installation notes

IQ Pro and IQ Pro P are hybrid security platforms with partitioned operation, PowerG wireless support, and multiple user interface paths. Official source Product page: DSC IQ Pro / IQ Pro P (ID 2714)Manual basis: curr...

Overview

IQ Pro and IQ Pro P are hybrid security platforms with partitioned operation, PowerG wireless support, and multiple user interface paths.

Official source

Platform characteristics

  • Supports HS2LCD keypad interfaces
  • Supports PowerG PG wireless devices
  • Supports IQ Remote user interfaces
  • Supports partition-based operation for multi-area sites

Service perspective

Plan keypad and IQ Remote layout per partition so operators always have local status and arming control in assigned areas.

Installation Notes

Suggested commissioning sequence

  1. Mount panel and establish baseline power — verify AC and battery charge.
  2. Add HS2LCD keypads on Corbus; assign unique addresses; confirm [*, 2] trouble scroll.
  3. Enroll PowerG transceiver keypads (HS2LCDRF/WF) before remote PG sensors.
  4. Enroll PowerG PG sensors and sirens; run placement test at final mount locations.
  5. Add IQ Remote devices; map each to correct partition; test arming scope.
  6. Program partitions, user codes, and reporting path in DLS/dealer software.
  7. Complete walk test, bell/siren test, and central-station communication test.

Corbus wiring reminders

  • Homerun +/-, Y, G — no T-taps on Corbus branches.
  • Reserve AUX budget for all HS2LCD and expansion modules before power-up.
  • UL fire listed installs: use HS2LCD (non-P variant) where manual requires.

Operational check before handoff

  • Trouble-free on HS2LCD and IQ Remote for assigned partitions
  • Arming/disarming verified per partition and user code
  • End-user shown [*][2] trouble path on primary keypad

Open Manual