Overview
Qolsys IQ Stand Generation 1 Hub is listed here in the modules and accessories category. For details, start with the manufacturer's own information.
Official information
Installation Notes
Follow Qolsys accessory install supplement and the official resource links in this product folder for mounting, wiring, and enrollment.
Pre-install checklist
- Confirm panel model (IQ Panel 4/5/Pro/Hub) and encryption requirements.
- Verify dealer cell account and module SKU before cell install.
- Document installer code and existing zone map for takeover jobs.
- Plan antenna routing (ANT5XL) when panel location has poor cell RSSI.
- Have listed batteries and tools for sensor mounts before enrollment.
Typical install sequence
- Mount and power panel; apply firmware updates per dealer bulletin.
- Install cell module and run communication test / Alarm.com activation.
- Enroll wireless sensors via installer Learn mode; label zones.
- Include Z-Wave devices after excluding from any prior hub.
- Install IQ Card for legacy sensors or optimize PowerG placement before fringe wireless devices.
- Run walk test, user code training, and central station test if monitored.
Power and connectivity reference
| Product type | Power | Network / RF |
|---|---|---|
| IQ Panel 4/5/Pro/Hub panel | AC + backup battery | PowerG sensors; IQ Cards; Z-Wave automation |
| Wireless sensor | Battery per SKU | PowerG encrypted; IQ Card 319/345 legacy |
| Cell module | Panel-powered | LTE to dealer / Alarm.com |
| IQ Remote keypad | PowerG link | IQ Panel host |
| Z-Wave module | Mains or battery per device | Z-Wave to panel |
Source: Qolsys accessory install supplement (Qolsys official documentation).