DSC Alexor installation notes

Alexor PC9155 is a wireless intrusion panel built around compact deployments and fast enrollment workflows. Official source Product page: DSC Alexor PC9155 (ID 53)Manual basis: *Alexor Installation Guide v1.1* and *Al...

Overview

Alexor PC9155 is a wireless intrusion panel built around compact deployments and fast enrollment workflows.

Official source

Capacity and I/O profile

  • Wireless zones: 1 to 32
  • Auxiliary output current: 200 mA
  • On-board I/O points can be used either as:
  • Zone 33 and Zone 34 inputs, or
  • Low-current PGM outputs (50 mA)

Enrollment behavior

  • Wireless enrollment section: [804]
  • First keypad enrollment window is approximately 2 minutes after initial power-up

Signaling options

  • Optional communicator modules include TL265, TL265GS, GS2065, and GS2060 family IP/cellular modules.
  • For SIA CP-01 installations, minimum equipment is PC9155-433 control panel plus WT5500-433 keypad.
  • Optional: WT5500P-433 (prox reader), PT4 prox tags, WT4989 keys, WT4901/WT4911 sirens.

Installation Notes

Suggested install sequence

  1. Bench power panel and enroll first keypad during the 2-minute startup window.
  2. Enter [804] and enroll all wireless zones.
  3. Decide I/O role (zones 33/34 or PGM outputs) and program accordingly.
  4. Validate communicator path when TL265 or GS2065 is installed.
  5. Complete full walk test and reporting test before final mounting.

Wireless enrollment sequence ([804])

Enroll in this order: keypad → sirens → sensors → pendants → wireless keys.

  1. Power panel — AC Power and Ready LEDs flash for ~2 minutes for first keypad enrollment.
  2. Press any button on the first WT5500 within that window.
  3. For additional devices, use installer [804] — enter ESN from device sticker (6-character alphanumeric).
  4. Assign zone 01–32 (one device per zone); accept recommended zone type or scroll options.
  5. Panel enters individual placement test after each sensor enrollment — verify RF before [#] to next device.
  6. Run global placement test after all devices are enrolled.

I/O programming ([013] options 1–2)

TerminalZone modePGM mode
I/O-1Zone 33 inputPGM output 50 mA
I/O-2Zone 34 inputPGM output 50 mA

Cannot use the same point as both zone and PGM simultaneously.

Open Manual